Source: https://tevelis.com/data-engineering/

# Data engineering

Data your company can act on, which begins with agreeing what each number means and who answers for it.

## From the figures a board reads to the systems behind them

Each service works on one layer, and each has its own section further down this page. Most engagements touch two or more.

- What each figure means, and who answers for it

Agreeing who answers for the data your decisions depend on, written into a document short enough for busy people to use.

Data governance

- One place to report from

Gathering the numbers your teams report against into a single place, each given one agreed meaning and one system it is drawn from.

Data warehousing

- Where it runs

Choosing the cloud platform suited to the queries you run most, then standing it up with cost limits in place from day one.

Cloud data platforms

- The systems underneath

Moving your records between systems so that what lands in the new one can be proven against what left the old.

Data migration

## Where to begin

A platform chosen before anyone has agreed what the key figures mean often has to be rebuilt later, and a migration into a warehouse nobody trusts moves the problem without solving it.

Most engagements therefore open with governance, even if only for the handful of numbers a board actually reads, and the engineering follows from those decisions.

Amos Weiskopf also builds the pipelines, so the definitions agreed in a meeting are the ones that end up in code.

## Sized to the company

### Three systems

A small business with three systems needs far less than a group running a dozen, often only one or two of these services.

### A dozen systems

A group running many systems usually needs governance first, for the figures its board reads, before any engineering starts.

## Data governance

A data governance framework short enough that people follow it, with a named owner for each set of data your decisions depend on.

Most governance efforts go the same way: a long policy is written to anticipate every case, then sits in a shared folder that nobody opens.

A version that works starts from the data the company really acts on and gives each set an owner. It stays short, keeping only the handful of rules worth the trouble of enforcing.

Ownership has to sit with named people. When a reported figure looks off, one person should be accountable for it and have the standing to put it right. A framework this small tends to stay in use after Amos has gone.

Tevelis also builds the pipelines and infrastructure that data runs through, so the framework is written with that engineering in view. Each quality check is designed to run on your own systems, or on a copy under your control, so the checks the policy describes are ones that actually run.

For the brief, tell Amos which datasets carry your decisions and where they sit today. Point to any figures that have misled you before, and to rules you already try to keep. An engagement usually opens with a small piece of work on your own data, so you can weigh it before going further. Your data stays in your hands throughout.

Amos Weiskopf has spent more than two decades building software and data systems for companies and governments, so the framework stays close to how your data is really gathered and used.

### What a framework covers

The work is sized to the company and to the state its data is already in. The parts below are what a framework tends to touch.

### Ownership

Who owns each dataset that decisions rest on, and who to ask when a number looks wrong.

### Agreed definitions

A shared meaning for the terms that teams argue over, written down so the argument stops.

### Rules that matter

The small set of rules worth enforcing, chosen because breaking one causes a real problem.

### Access and sensitivity

Who may see which data, and how the more sensitive sets are handled and shared.

### Quality checks

Simple tests that catch the errors most likely to mislead a decision, run where the data lives.

### A written policy

A data governance policy short enough that the people bound by it will read it.

### Keeping it current

A light way to review the framework as the data and the company change, without a committee that meets forever.

### What is data governance?

It is the rules and ownership that decide who is responsible for your most important data and how accurate it has to be before anyone acts on it. Kept short, it is far more likely to be followed.

### What is the difference between a framework and a policy?

The framework is the working arrangement: who owns which data and how it is kept accurate. The policy is the written document that states the rules, and it only works if it is short enough to be read.

### How long does a data governance framework take to set up?

That turns on how many datasets carry weight and what condition they are in. The work begins with the few that matter most, and the timetable is settled in the brief.

### Do we need a governance committee?

Usually not a large one. Responsibility tends to hold better with a few named owners than with a standing committee that meets to review rules nobody reads.

### Can the checks run on our own systems?

Yes. The quality checks are made to run on your data where it sits, or on a copy you hold yourself. If any of it might go to an outside provider, that is agreed with you first.

## Cloud data platforms

Choosing the cloud data platform that fits the work you actually run, and setting it up so your own people can keep it going.

Most platform choices are made from a feature comparison and a vendor demo, where the main options all look capable. Each of the leading platforms can run a reporting warehouse or a machine learning workload, so a demo settles very little. A better starting point is the work you already have: the queries you run most, and how much data they touch.

Cost needs the most care. Each platform prices differently, so the same workload can be cheaper on one and dearer on another depending on how it is used, and teams who read only the per-credit or per-terabyte rate are often surprised by the bill.

Most of the money goes on warehouses left running and on queries that scan more data than they need. The useful comparison is your own workload priced on each platform, with the charges that do not appear in the headline rate written out.

The other question is who will run the platform once it is chosen. Databricks suits a team comfortable with notebooks and Spark. BigQuery suits people who think in SQL and want little to administer, and Snowflake is closer to BigQuery in that respect.

A platform that needs skills your team does not have, and cannot easily hire, becomes a cost of its own. The aim is a setup your own people can operate, with cost controls in place from the first day.

For the brief, say what you run on data today and what you want to run next, and which platforms you are already considering. An engagement usually opens by pricing one of your real workloads on the platforms in contention, so you can see the numbers before committing to a build.

Amos Weiskopf has built data pipelines for years, including ones that feed machine learning models, which are the jobs a platform has to carry.

### What the work covers

A platform decision reaches into how data arrives and what the monthly bill turns out to be. These are the parts the work tends to touch.

### The workload first

What you actually run, from dashboards to machine learning, and which of those should drive the choice.

### Platform comparison

The main options compared on your own queries and data volumes.

### A real cost picture

What the platform costs under your usage pattern, including the charges that do not show up in a list price.

### Who will run it

Matching the platform to the skills your team already has, so it does not need specialists you cannot hire.

### Setup and loading

Standing up the platform and getting data into it, with the pipelines that keep it current.

### Access and separation

Who can reach which data, and how development is kept apart from what runs in production.

### Cost controls

Warehouse sizing and query limits set so a single job cannot run the bill up overnight.

### What is a cloud data platform?

A cloud data platform stores your data and runs queries and analytics on it without servers of your own. Snowflake and Databricks are the best known, along with Google’s BigQuery, and each suits a different kind of work.

### Which cloud data platform should we choose?

It depends on what you run, how much data you hold and what your team already knows. The right choice is worked out from your own workload and priced on each option.

### Will a cloud data platform cost more than we expect?

It can, when a warehouse is left running or queries scan more than they need. Pricing your real workload on each platform before you choose, and setting cost controls at setup, keeps the bill close to the plan.

### Can our own team run the platform afterwards?

That is one of the main things the choice should turn on. The platform is matched to the skills your team already has, so it can be operated without hiring specialists you cannot find.

### Does our data stay under our control?

Yes. The platform runs in your own cloud account, and the data stays with you throughout. If you want to sign a non-disclosure agreement before sending anything sensitive, that can be done first.

## Data migration

Moving your data from one system to another so that what arrives can be shown to match what left.

Most migrations are planned as if the source data is clean, and it rarely is. Typical problems include:

- dates stored as text

- duplicate customers

- fields that two teams filled in two different ways

Problems like these tend to surface during the load itself, when the schedule has no room left for them, which is why the source is read closely before anything is mapped.

The part that gets cut when time runs short is reconciliation, and it is the part that carries the most risk. The source is counted and measured first, which gives a figure to check the result against. After the load, the same measures are taken on the new system and the two sets of figures are compared.

Where the records carry weight, the way a ledger of balances and orders does, the comparison goes down to the individual record, because a matching total can still hide errors that cancel each other out.

A cut-over can still fail after the checks pass, because some problems only show up once people start using the new system. For that reason the move is planned with a way back to the old system, tried in advance.

Amos Weiskopf writes the reconciliation checks as part of the plan, so the proof that the move worked is designed before the move starts.

For the brief, say which system the data is moving from and to, and which records you cannot afford to get wrong. Mention when the old system has to be switched off. Work usually begins with a trial load of a slice of your real data, so the mapping and the checks can be judged before the full move.

### Parts of a migration

A migration reaches past the copy itself. The parts below are the ones it usually touches.

Before the move

### Reading the source

Finding out what the old system actually holds, including the records that break the rules the schema claims to enforce.

### Mapping the fields

Deciding where each field goes in the new system, and what happens to data that has no place to land.

### Reconciliation before

Counting and checksumming the source so there is a known figure to compare the result against.

The switch

### The cut-over plan

Working out the order of the move, how long each part takes, and when the old system is switched off.

After the move

### Reconciliation after

Checking the loaded data against the figures taken from the source, down to the record where it matters.

### Handover

Leaving your own people able to run the new system and to read what the migration did.

### Rollback

A tested way back to the old system if the reconciliation fails or something is found after the switch.

### What is data migration?

It is the move of your data from one system to another, done so that the records in the new system can be shown to match the ones in the old. Most of the work is in reading the source and checking both sides against each other across the cut-over.

### What happens if the cut-over fails?

The move is planned with a tried way back to the old system, so a problem found during or after the switch does not leave you stranded. The rollback is prepared and tested before the cut-over.

### How do you know the data arrived correctly?

The source is counted and measured before anything moves, and the same measures are taken on the new system afterwards and compared. For records that carry weight, the check goes down to the individual record, because a matching total can hide offsetting errors.

### How long does a data migration take?

That depends on the volume of data and the state it is in. The timetable is agreed in the brief, with the cut-over date set around when the old system can be switched off.

### Will our data stay under our own control?

Yes. The migration runs on systems you control, or on copies that stay with you. A non-disclosure agreement can be signed first if you want one before sending anything sensitive.

## Data warehousing

A warehouse where each number your teams report on has one agreed definition and one place it comes from.

Buyers ask for a single source of truth, and what usually gets built is a technical project that ends with dashboards. That part can go smoothly and still leave two departments quoting different revenue figures to the same board.

The disagreement was about what revenue means and who decides when two systems give different answers, and a new database settles neither.

The slow work is agreeing the definitions, which is a conversation with the people who own the numbers. Each figure that decisions rest on gets one written meaning and one source system, settled by the people who will have to live with it, and the warehouse is then built so the number can only be read that way.

Most of the budget and the calendar go here, and it is often the first thing dropped when a project runs late.

For the brief, say which numbers your teams argue over and which systems they come from today. Name the person who can settle a definition when two sources disagree. An engagement usually opens by defining and loading one of your real, contested numbers, so you can judge the approach before the full warehouse is built.

Amos Weiskopf agrees each definition with you and then builds it into the warehouse as written, so nothing is lost between the meeting and the code.

### Where the effort goes

A warehouse project reaches into how numbers are defined well before it reaches the storage. These are the areas the work usually involves.

### Agreed definitions

Writing down what each important number means, so that two teams reading the same figure read the same thing.

### One source per number

Deciding which system a number comes from, so the same metric is not calculated two ways.

### The model underneath

Structuring the warehouse so the agreed definitions are built into how a number can be read at all.

### Loading and refresh

Getting data in from the source systems and keeping it current on a schedule people can rely on.

### Reconciliation

Comparing the figures in the warehouse against the systems they came from, down to the individual record where that matters.

### Access and control

Deciding who can read and change which numbers, and keeping the raw data under your own control.

### Handover

Leaving your team able to operate the warehouse and to add the next number on their own.

### What is data warehousing?

It is bringing the numbers your business reports on into one place, with each figure given a single agreed meaning and a single source system, so that teams stop working from different versions of the same metric.

### How is a single source of truth actually achieved?

By agreeing what each important number means and which system it comes from, then building the warehouse so those definitions govern how the number can be read. Building the storage is the smaller part of the work.

### Will our data stay with us?

Yes. The warehouse runs in your own cloud account or on your own servers, and your raw data stays with you.

### How do we know the warehouse figures are right?

Every figure in the warehouse is checked against the system it came from. For the numbers that carry the most weight, the check is made on individual records as well as on totals.

### Can our own team run it afterwards?

Yes, and the build is planned for that. The warehouse is set up around the skills your people already have, and the handover leaves them able to run it and to add the next number themselves.

## Questions buyers ask

### Which of these services do I need first?

If your teams argue over which figure is right, start with governance or the warehouse. If a system is being replaced, the migration comes first. The brief is where that order is settled.

### Can you work with the platform we already have?

Usually, yes. A new platform is only worth recommending when the current one cannot carry the work or costs far more than it should.

### What does data engineering cost?

The price depends on how many systems and figures are involved: for governance, how many datasets carry weight; for a platform, how many workloads are in play and how much setup they need; for a migration, how much data moves and how many records are reconciled one by one; for a warehouse, how many numbers have to be defined. It is quoted after the brief. Engagements start at 1,500 euros, and the fixed fee comes back within 24 to 48 hours of the brief, often sooner.

### How do we begin?

With a written brief. Say which figures your teams argue over and which systems feed them today, and the scope is worked out from there.

## Engagements by written brief.

Describe the problem in a few paragraphs. A meeting can come before or after that, if you want one.

TEVELIS EST 2026

Tevelis is independently held. It takes no outside capital, and it accepts neither referral fees nor equity as payment.

Practices Past work Amos Weiskopf

amos@tevelis.com Book a meeting Privacy Terms Security Conflicts

Tevelis Limited, private limited company, registration number HE 492969, Adonis, Aphrodite Hills, Kouklia 8509, Cyprus
